At Amazon, I designed six end-to-end order flows covering 133 products and authored 44 SOPs to prepare same-day perishables fulfillment for launch. I also developed capacity projections through 2028 and coordinated implementation requirements across teams.
At Grupo Modelo / AB InBev, I redesigned a production and distribution footprint using demand and capacity analysis, enabling 30% more production volume and approximately USD 2 million in annual transportation savings. As Logistics Manager in Tierra Blanca, I raised inventory accuracy from 28% to 89% through digital counts and audits, reducing approximately USD 1.5 million in inventory-related financial exposure.
My work spans operational excellence, warehouse and logistics operations, planning, and cost improvement. I’m an industrial engineer and Lean Six Sigma Black Belt, with experience in KPI management, digital process improvement, SAP ERP/MRP and WMS operational use.

