At Bridges to Prosperity, I assessed potential bridge sites in Uganda, working with local leaders and communities to evaluate feasibility and select bridge centreline locations. I also coordinated spatial analysis of needs assessment data using ArcGIS and QGIS.
At National Water & Sewerage Corporation, I analyzed Kampala Water’s operational performance, maintained performance databases, and prepared reports for management. As a Branch Engineer, I coordinated water distribution operations and leak detection and repair.
At Kagga & Partners Consulting Engineers, I contributed to road, drainage, and hydropower projects through design, site supervision, and technical reporting. My work included a 1.8 km pilot Non-Motorised Transport route and preliminary access-road design for the Muzizi Hydropower Project.

