At Tajco, I led the relocation and redesign of the MRO warehouse using Solid Edge, reducing required floor space by over 50% and streamlining maintenance fulfillment.
I designed and implemented the physical MRO inventory system from scratch, with material traceability and purchase requisitions managed in Microsoft Dynamics AX and SAP ERP.
I applied Lean and Six Sigma methods across warehouse and production lines, including 5S, DMAIC, and Poka-Yoke devices. I also drafted SOPs with generative AI tools and monitored operational KPIs using Excel, Minitab, and Power BI.
On an Applied Engineering Project, I used DMAIC, root-cause analysis, and Pugh Matrices to establish a standardized workflow that reduced cycle times and improved delivery schedules. At AzVi Productions, I planned commercial projects and optimized workflows and digital asset storage.

