Skip to main content
Wouter van DierenWD
Open to opportunities

Wouter van Dieren

@woutervandieren

I optimize factory operations through simulation, logistics design, and industrial engineering.

Netherlands
Message

What I'm looking for

I'm looking to improve manufacturing and logistics systems by using simulation, data-driven analysis, and practical factory-floor improvements to address process root causes.

At Ergo-Design, I help optimize manufacturing and logistics through factory layouts, manufacturing lines, logistic concepts, simulation studies, smart scheduling, takt clocks, and digital scoreboards. I focus on solving root causes rather than adding people, equipment, or working hours.

Previously at VIRO, I built and validated discrete-event simulation models and digital twins to support well-founded operational decisions. For my master’s thesis at Voortman Steel Machinery, I developed a simulation-optimization strategy for pre-assembled module inventory to simplify planning and target machine delivery within 10 weeks.

Experience

Work history, roles, and key accomplishments

Ergo-Design B.V. logoEB
Current

Industrial Engineer

Jul 2024 - Present (2 years 1 month)

Ergo-Design BV – Industrial Engineering

Combines manufacturing and logistic consultancy, mechanical design and industrial engineering expertise with ‘innovative tools’. As designers, we are ‘interior designers of the factory’ and as performance specialists, “we tune your process’ or ‘we stimulate your organization’. Sometimes at firstin the ‘serious gaming’ environment of our ‘Digital factory’ an

VIRO logoVI

Simulation consultant

Apr 2022 - Jun 2024 (2 years 2 months)

VIRO has more than a decade of experience in discrete event simulation, resulting in an extensive customer base in a wide range of sectors, from processing industry, machine assembly and semicon to the service sector.

Common goals of clients are to work more efficiently, increase productivity, reduce inventory and cutting costs. Automation is often seen as the key to the solution, but just as of

Voortman Steel Machinery logoVM

Master Thesis

Apr 2021 - Mar 2022 (11 months)

The objective of my master thesis was to develop a new strategy for the assembly of the automated steel processing machines of Voortman Steel Machinery. The goal of this new strategy was to simplify the planning process and reduce the delivery time of the machines. To achieve this, it was decided to stock pre-assembled modules so that the delivery time of the parts needed for these modules would n

Education

Degrees, certifications, and relevant coursework

UT

University of Twente

Master of Science - MSc, Industrial Engineering and Management

2019 - 2022

I completed a pre-master before the master
Grade: 8

University of Twente logoUT

University of Twente

Master of Science, Industrial Engineering and Management

2019 - 2022

Grade: 8

Completed a pre-master before the master. Achieved a grade of 8.

SS

Saxion University of Applied Sciences

Bachelor of Science - BSc, Industrial Engineering and Management

2017 - 2018

1-year post-bachelor program

Saxion University of Applied Sciences logoSS

Saxion University of Applied Sciences

Bachelor of Science, Industrial Engineering and Management

2017 - 2018

Completed a 1-year post-bachelor program.

VS

Van Hall Larenstein University of Applied Sciences

Bachelor of Science - BSc, Land and Water Management

2011 - 2015

4-year bachelor

Van Hall Larenstein University of Applied Sciences logoVS

Van Hall Larenstein University of Applied Sciences

Bachelor of Science, Land and Water Management

2011 - 2015

Completed a 4-year bachelor program.

Tech stack

Software and tools used professionally

Get matched with your dream remote job

Sign up now and join over 250,000+ remote workers who receive personalized job alerts, curated job matches, and more for free!

Sign up
Himalayas profile for an example user named Frankie Sullivan