
Madan Murari
@madanmurari
I maintain cement plant rotary equipment, reducing downtime through preventive, predictive, and corrective maintenance.
What I'm looking for
I've maintained critical equipment across cement plants including Sagar Cements, Green Valley Industries, Palpa Cement Industries, United Cement, and JUD Cement.
I work on rotary kilns, VRMs, ball mills, coolers, preheaters, crushers, conveyors, stackers, reclaimers, compressors, and blowers. My maintenance work combines preventive, predictive, and corrective approaches to improve reliability.
I've reduced equipment downtime by 20% through proactive monitoring and timely interventions, and reduced bucket-elevator breakdowns by 25% through inspections and maintenance. I use vibration and temperature analysis to identify early signs of equipment wear and failure.
I've handled coal ball mill shell replacement and alignment with girth gears, air-swept circuit duct replacement, and raw ball mill trunnion bearing scrapping. I also perform precision motor alignment up to 1000 kW and maintain detailed maintenance, breakdown, shutdown, lubrication, and greasing records.
Experience
Work history, roles, and key accomplishments
Engineer
Sagar Cements (M) Private Limited
Feb 2026 - Present (7 months)
Engineer at a 3000 TPD cement plant with a 6-stage preheater (ThyssenKrupp). Responsible for maintenance and reliability of cement production equipment.
Engineer
Green Valley Industries Ltd.
Jan 2025 - Jan 2026 (1 year)
Engineer at a 1000 TPD cement plant with a 5-stage preheater (Walchandnagar Industries). Focused on mechanical maintenance and reliability improvement.
Engineer
Palpa Cement Industries Pvt. Ltd.
Jul 2024 - Jan 2025 (6 months)
Engineer at a 1800 TPD cement plant with a 5-stage preheater (FLSmidth). Responsible for maintenance of rotary equipment and material handling systems.
Assistant Engineer
United Cement (K.L. Dugar Group)
Oct 2021 - Jul 2024 (2 years 9 months)
Assistant Engineer at a 1000 TPD cement plant with a 4-stage preheater (CPW). Supported maintenance and troubleshooting of mechanical systems.
Assistant Engineer
JU D Cement Ltd.
Dec 2019 - Oct 2021 (1 year 10 months)
Assistant Engineer at a 1000 TPD cement plant with a 4-stage preheater (Walchandnagar Industries). Performed preventive and corrective maintenance on cement plant equipment.
Education
Degrees, certifications, and relevant coursework
Career Point University
Bachelor of Technology, Mechanical Engineering
Grade: 58.9%
Completed Bachelor of Technology in Mechanical Engineering with 58.9% marks.
S.D. College, Gouripur
Intermediate, Intermediate
Grade: 61.2%
Completed Intermediate (12th) with 61.2% marks.
S.S. High School, Gouripur
High School, High School
Grade: 53.2%
Completed High School (10th) with 53.2% marks.
Tech stack
Software and tools used professionally
Availability
Location
Authorized to work in
Salary expectations
Job categories
Skills
Interested in hiring Madan?
You can contact Madan and 90k+ other talented remote workers on Himalayas.
Message MadanGet matched with your dream remote job
Sign up now and join over 250,000+ remote workers who receive personalized job alerts, curated job matches, and more for free!
