At Empresa de Transmisión Eléctrica S.A. (ETESA), I analyze the National Interconnected System and Regional Electrical System using PSS/E. I contributed to the technical analysis and final reports for the 2023 and 2025 nationwide blackouts.
I automated N-1 contingency analysis with Python, modernized legacy scripts from Python 2 to Python 3, and developed graphical tools for operational data. My stability studies have included the Panamá–Panamá III corridor repowering and the impact of losing Proyecto Gatún during commissioning tests.