At Meta Sun Instalações Elétricas, I analyze utility bills and interval metering data for medium-voltage customers, then prepare proposals with financial feasibility analysis. I built a model comparing six investment scenarios and diagnosed underperformance at two PV plants down to a defective module batch, managing the warranty claim through approval.
As an independent energy consultant, I optimized contracted demand for more than 10 businesses, eliminating demand overrun penalties. I also moved a coffee roaster from the medium-voltage to the low-voltage tariff group, cutting its monthly bill by 40%.
At Rovema Energia S/A and UzziEnergy, I performed 167 feasibility studies for migration to Brazil's free energy market; 23 companies migrated, with average savings of 10.01%. I registered and validated energy volumes for a 1 MWavg power contract in CliqCCEE, monitored metering data in SCDE, and designed and commissioned more than 40 PV plants totaling 441.62 kWp.
Earlier, as an Engineering Intern at Sustennutri, I structured maintenance plans and work-order tracking and measured power quality against Brazilian grid standards. I also served as a Substitute Lecturer at Federal University of Rondônia and hold a B.Sc. in Electrical Engineering from Federal University of Rondônia.

