Lead Design Engineer at Orlanda Engineering, delivering 60+ façade projects and cutting production waste to 0.6%.
What I'm looking for
At Orlanda Engineering, I grew from façade designer to project manager and built the façade design department from scratch. I delivered 60+ projects and cut production waste to 0.6% against a planned 1–2% allowance.
For Hoveret Pratim Muran-Netaniya, I held responsibility for design, shop drawings, production packages, order coordination, installer support, and deadlines. I also established the department’s laser-scanning methodology and led a delivery team.
I developed AutoCAD tools to automate detailing and check production documents, and trained a YOLOv8 model to recognize façade profiles on drawings. I packaged these tools into a standalone Windows application for team use.
Earlier, at ISHENGIR, I produced 400+ drawings for PETRONAS Carigali to PTS and British Standards and led the electrical discipline across the portfolio. At Çalık Enerji, I completed electrical design for about 130 substations connected to the national grid.
Experience
Work history, roles, and key accomplishments
Project Manager
Orlanda Engineering
Aug 2022 - Nov 2026 (4 years 3 months)
Built the façade design department from scratch, led a team of 5, and delivered 60+ façade projects. Developed automation tools and cut production waste to 0.6%.
Lead Engineer
ISHENGIR
Jan 2017 - Dec 2020 (3 years 11 months)
Produced 400+ drawings for a PETRONAS gas terminal to PTS and BS standards, led electrical discipline, and supervised installation crews.
Electrical Design Engineer
Çalık Enerji
Jan 2014 - Dec 2017 (3 years 11 months)
Completed electrical design for about 130 substations (10-220 kV) for the national grid, including full design packages and 3D modeling.
Architectural Designer
VINCI Construction
Jan 2013 - Dec 2014 (1 year 11 months)
Produced full interior design packages for a government building, integrating electrical and ventilation systems into drawings.
Electrical Design Engineer
Rönesans Construction
Jan 2012 - Dec 2013 (1 year 11 months)
Delivered full electrical scope for four sites, including low-current systems and underground utilities, with design revisions and site coordination.
Assistant Mechanical Engineer
BELDA
Jan 2011 - Dec 2012 (1 year 11 months)
Produced mechanical documentation packages for heating, ventilation, air conditioning, water supply, and sewage.
Assistant Electrical Engineer
Polimeks
Jan 2010 - Dec 2011 (1 year 11 months)
Produced electrical documentation for a national landmark, including drawings, plans, and specifications.
Education
Degrees, certifications, and relevant coursework
Moscow Technological Institute
Not completed, Industrial and Civil Engineering
2016 - 2018
Pursued Industrial and Civil Engineering but did not complete the program.
Moscow Technological Institute (WTU)
Bachelor of Engineering, Electric Power Supply
2012 - 2016
Bachelor of Engineering in Electric Power Supply, with a thesis on the upgrade of a 110/10 kV substation.
Availability
Location
Authorized to work in
Salary expectations
Social media
Job categories
Skills
Interested in hiring H-Arti?
You can contact H-Arti and 600K+ other talented remote workers on Himalayas.
Message H-ArtiGet matched with your dream remote job
Sign up now and join over 1,000,000+ remote workers who receive personalized job alerts, curated job matches, and more for free!