At Fainger Engineering, I served as Head– Materials & CapEx Procurement, developing alternate vendors and negotiating to achieve 10–18% cost savings over 12 months. I also improved supplier on-time delivery from 65% to 90% through a vendor-rating system.
At Perfect Containers Pvt. Ltd., I served as Plant Head for aluminium collapsible-tube production. I improved productivity by approximately 20–25%, reduced rejection from 15% to 5%, and helped lower manpower costs by approximately 30% through process automation.
At Meher Distilleries Pvt. Ltd., I improved bottling-line productivity by approximately 25–30% through process improvement and waste elimination. I also reduced raw-material costs by approximately 15–25% and wastage by approximately 15%.
My earlier roles included Plant Head at Weavetech Engineering Ltd. and Anupriya Ultratech, as well as quality and production roles in automotive, packaging machinery, and steel-ball manufacturing. Across these roles, I worked on productivity, rejection reduction, supplier qualification, audits, and production process improvements.

