At INTEC INFRA TECHNOLOGIES, I developed as-built 3D BIM models of Neuqua Valley High School, representing existing steel and concrete elements for renovation planning.
On the R&D and Industrial Unit at Bally Murtagh, I developed 3D models of steel framing systems and performed clash detection and model audits to support coordination and construction.
Previously, as a BIM Modeller at PINNACLE INFOTECH SOLUTIONS, I created Revit models and shop drawings for projects including Taiwan Taoyuan International Airport. I also contributed to landscape modeling and model coordination for Dubai International Airport.
For the Huntsman Mental Health Institute, I developed structural BIM models and assisted with construction drawings, sections, schedules, and quantities. My work includes Revit-based BIM documentation, model coordination, and LOD 100–400 deliverables aligned with project requirements.

