At Consorcio Estación Bombeo 1303, I manage cost control and scheduling for the Casablanca Water Transmission Pipeline, connecting the Casablanca Water Storage Tank to the EAAB trunk network. I re-baselined the project schedule around operational challenges and construction constraints, and integrated cost and performance analysis into management reporting.
At Coinval S.A.S., I designed hydrosanitary systems for institutional, municipal, and public infrastructure projects, including Hospital Simón Bolívar and IE Sinai. Earlier, at Construval Ingeniería, I developed and obtained approval for an alternative sanitary sewer connection design for Verderón II after the original design proved unfeasible during construction.