At John Cockerill - Energy Solutions / AfterSales APAC, I coordinate engineering and site execution for HRSG casing replacement and ducting at Senoko Power Plant. I oversee fabrication and installation of casing, exhaust duct, stack, and silencer systems with multiple contractors.
Previously, I commissioned and maintained SGRE wind turbines at Siemens Gamesa Renewable Energy and managed technical operations for a 19.4MW cogeneration plant at THUAN HAI ENERGY. My work has also included thermal calculations, boiler and turbine performance optimization, and commissioning industrial power systems.

