At Hutchison Ports – Karachi International Container Terminal Limited, I head civil, electrical, and mechanical terminal port projects and oversee facility management for the terminal infrastructure. I also propose and monitor project CAPEX and OPEX budgets and manage infrastructure assets and inventory.
My projects at HP KICT include the design of a 26-hectare container terminal redevelopment, a detailed topographical survey with 3D point cloud models and a VR360 platform, and construction and refurbishment work across terminal facilities. I also worked on drainage for a reefer container stack and replacement of a 170-meter portion of quay crane landside rail.
Earlier, I worked as a Civil Engineer at HP KICT, an Assistant Project Manager at Global Stern in France, and a Project Engineer at MIMA Construction Private Limited. My education includes an MBA, a Master’s in Engineering Management – Construction, a research-based master’s diploma, and a bachelor’s degree in Civil Engineering.

