At Integra Global Solutions, I prepared quantity takeoffs for commercial and residential construction projects by interpreting tender drawings, specifications, and BOQs.
I used AutoCAD, On-Screen Takeoff (OST), and PlanSwift to quantify structural and secondary elements, including drywall, sheathing, stud and metal framing, and insulation.
I analyzed material, labor, subcontractor, and overhead costs during prechecking and final Excel verification, helping ensure quality control before client submission. I also evaluated variations and file revisions and coordinated with design, engineering, and project teams to resolve estimation queries.
For my academic project, I designed and analyzed a canteen structure that received Chairman approval and was constructed on campus based on the proposed engineering design.

