At SUPRAJIT ENGINEERING LIMITED, I took responsibility for TPM roadmap planning, pillar implementation and audits as Plant TPM Coordinator. I helped the organization achieve the JIPM TPM Excellence Award in 2025.
I executed AM Steps 0 to 4 across the plant, contributing to around 1.5% unplanned downtime. In the Outer & Inner formation section, I improved OEE from 63.4% to 88.5% and helped raise plant-level productivity from 125 to 200 units.
I mentored 11 TPM and JH circles and implemented more than 100 OPLs. My work also included reducing minor stoppages by 81% through the KK Pillar and reducing average downtime by 43% using MTBF/MTTR analysis.
Earlier at SUPRAJIT ENGINEERING LIMITED, I optimized production flow, reducing cycle time by 18% and increasing line efficiency by 33%. At JBM GROUP, I assisted with production planning and shift operations, and contributed to kaizen projects.

