At Rahab Sazeh Azhman, I perform construction surveying for reinforced-concrete works, including a 17,500 m³ wastewater tank. I set out structural axes, check formwork dimensions and alignment, and monitor elevations.
I also prepare architectural and MEP shop drawings in AutoCAD for the Iran Khodro Binabroud industrial kitchen project, adapting design drawings to site conditions and coordinating across disciplines. For asphalt works, I carry out as-built surveys and calculate quantities for contractor interim payment statements.
Previously, at JAID Group, I prepared BOQs and tender documentation and produced MEP drawings for UAE projects. At Shahr-e Ziba Khavaran Consulting Engineers, I prepared urban planning and stormwater design packages and provided IT support.

