At ICC Engineering, I coordinate clashes and LV/ELV network submissions for Qiddiya’s QRRC155 and D12 Resort Core District, and manage shop drawing submission logs across six discipline packages.
At KEO International Consultants, I led a company-wide Dynamo initiative linking 2D drawings to models; the method was adopted across all company projects. I also model wet and dry utilities and prepare shop drawings from IFC through as-built for projects including Amaala and the Red Sea.

