Masagus Riko Yofanda

@masagusrikoyofanda

Project Control Manager at Huadian Heavy Industries Co., Ltd., coordinating EPC delivery and reporting across project work.

Indonesia
Message

What I'm looking for

I’m seeking project planning and control work involving schedule monitoring, mitigation, cost and progress reporting, and coordination across project teams.

At Huadian Heavy Industries Co., Ltd., I work on Engineering, Procurement and Construction through monitoring, coordination and reporting. My current work builds on project control experience across EPC and operations and maintenance.

At PT Koin Konstruksi, I developed and updated project schedules in Primavera P6 and MS Project, identified potential delays and helped facilitate remedial action. Earlier, as a Project Controller seconded to Chevron Pacific Indonesia, I tracked project plans and inter-project dependencies, reporting progress across oil and gas projects.

Experience

Work history, roles, and key accomplishments

HL
Current

Project Control Manager

Huadian Heavy Industries Co., Ltd.

Oct 2025 - Present (1 year 1 month)

Engineering, Procurement and Construction; Monitoring, Coordination and Reporting

PK

Sr. Scheduler

PT Koin Konstruksi

Aug 2021 - Jul 2024 (2 years 11 months)

Project Coordination
• Develop & Breakdown level’s schedules refer to erection/installation sequences. [P6 Primavera and MS Project]
• Assist Project Manager with schedule planning, task coordination, and monitor timelines of scheduled assignments.
• Identify potential scheduling delays and facilitate remedial action.
Documentation
• P6 scheduled update and MS Project report.
• 3 Weeks Look ahead

PT. Jurong Engineering Lestari (JEL) logoPJ

Project Control Coordinator

PT. Jurong Engineering Lestari (JEL)

Jan 2021 - Jul 2021 (6 months)

SOW;
Project Coordination
• Budget overview, calculation, and allocation cost.
• Budget review for manpower, equipment, and miscellaneous item.
• Planning and Scheduling scope of work priority.
• Schedule overview for monthly target refers to material availability.
• Progress Measurement; control monitoring, quantity check and review
• Coordination/justify to related team for finding, fault identi

PT. SATYAMITRA SURYA PERKASA logoPP

Project Control Coordinator

PT. SATYAMITRA SURYA PERKASA

Sep 2018 - Sep 2020 (2 years)

Project Coordination
• May serve data requirement for client, construction team, material team, subcontractor and fields personnel.
• Planning and Scheduling scope of work priority and critical path
• Schedule overview for monthly target refer to resource and available material
• Progress and control monitoring, quantity check and review
• Coordinate with construction team for modification install

JW

Project Controller

JO Rekayasa Engineering - Worleyparsons

Nov 2013 - Jul 2017 (3 years 8 months)

Seconded of Chevron Pacific Indonesia
Reporting to CPI Project Construction Team who is responsible Oil and Gas multiple projects with large budget, which include wells services (earth work and surface facilities) of drilling project, infrastructure development and improvement of facility capabilities, also environment performance standard construction project.
Responsible for monitoring of the ov

NI

Planning Engineer

Nata Indonesia

Feb 2013 - Apr 2013 (2 months)

Conceptual Development, Preparation of Turnaround/Major Overhaul Combustion Turbine, Boiler Improvement and Upgrade System. Maintain Project Schedule (Control Plan), Identify Outstanding Work, Initiated Work Order (CMMS JDE-E1) determine CAPEX and OPEX. Work with Warehouse team to check Available BOM on list of material requirement. Maintain Overhaul Activities; Coordination meeting, S-Curve Prog

Rekayasa Engineering logoRE

Maintenance Planner

Rekayasa Engineering

May 2010 - Jan 2013 (2 years 8 months)

Seconded of Chevron Geothermal Indonesia
Operation & Maintenance Planner assistant NDC Power Plant (3x100MW), to managing and to improve reliability, maintainability and availability of Combustion Turbine, Generator, Power Devices, Heat Recovery Steam Generator, Balance of Plant Equipment and life cycle cost, at North Duri Cogeneration Plant Facility
Manages and integrates all planning activities

TA

Assistant Planner

Tugumas Adeyogo

Apr 2008 - May 2010 (2 years 1 month)

Planning and Scheduling Operation and Maintenance
• SERIP Program (Surface Equipment Reliability & Integrity Process),
• Planning and Scheduling all activities Operation and Maintenance
• 7days Planning Scheduling.
• Long Range Planning Scheduling and Forecasting.
• Develop and Create Planning and Scheduling for turnaround such as Combustion Inspection, Hot Gas Path Inspection and Major Overhaul.

Education

Degrees, certifications, and relevant coursework

Universitas Muhammadiyah Palembang logoUP

Universitas Muhammadiyah Palembang

Bachelor's degree, Chemical Engineering

1999 - 2003

Tech stack

Software and tools used professionally

Interested in hiring Masagus Riko?

You can contact Masagus Riko and 600K+ other talented remote workers on Himalayas.

Message Masagus Riko

People also viewed

View all talent

Get matched with your dream remote job

Sign up now and join over 1,000,000+ remote workers who receive personalized job alerts, curated job matches, and more for free!

Sign up
Himalayas profile for an example user named Frankie Sullivan