At R&Q Ingeniería, I inspect civil works on CODELCO VP’s DRPA Stage 2 project, reviewing seal and drain excavation, wall backfilling, and test pad construction. I also prepare reports and track transported material volumes.
At Develp Ingeniería, I inspected work on the Talabre tailings dam Stage IX, including granular wall construction, drainage excavations, and HDPE pipe installation. More than 8 million m³ of ballast was hauled and placed for the wall raising, and civil works for the north mobile pumping station were completed on time.
At OHL Industrial, I supervised earthworks, concrete pours, and piping for the Mantos Blancos debottlenecking project. This included a 1,500 m³ mass concrete pour in 48 hours for the Ball Mill No. 8 foundation and the transport and installation of 1,760 tons of structural steel.