At ENERCHIMI, I prepare basic and detailed process design for utility and offsite units at Farsa PET Plant, including cooling water, demineralized water, instrument air, and tank farm systems. My work includes process documents, equipment sizing, and utility network calculations.
For ENERCHIMI’s Central Treatment Export Plant, I prepared process documents for early oil production and supported safe, efficient operations alongside the commissioning and start-up team. I also prepared operating manuals for oil treatment and gas compression units.
At PetroPars Iran Company, I contributed to detail design for Central Treatment Export Plant and South Pars Phase-19 Gas Refinery. For South Pars Phase 19, I prepared the basic design of a flare gas recovery package and helped implement and test automatic regeneration logic for molecular sieve beds in LPG treatment units.
I’ve also worked on process design for the Benzene Extraction Unit at Shazand Petrochemical Company, including participation in HAZOP and SIL studies. My process engineering work spans oil and gas projects from design through construction, start-up, and performance testing.

