At SPEC Company, I executed pre-commissioning and commissioning for refinery process and utility systems, taking them from mechanical completion through startup. I led system walkdowns against P&IDs, tracked punch-list items to closure, and prepared handover documentation.
On rotation as a Process Operator on the Catalytic Reforming unit, I monitored process parameters, took part in startup and shutdown steps, and responded to process upsets under supervision. I also coordinated piping tests and PSV and TSV calibration with the refinery.
I co-founded Al-Basheer Group and now provide technical consultation on construction, piping, tank, furnace, and equipment-installation projects. The company has grown to more than 700 technical specialists across Iraqi provinces.
Earlier, I coordinated site work involving piping fabrication and installation, storage tanks, and furnace construction. I also operated and maintained Reverse Osmosis water treatment systems, monitoring operating and water-quality parameters.