At National Grid Company of Pakistan Limited, I learned how the power grid works, including substations, transformers, protection systems, and consumer panels. I also observed electrical distribution and plant operations during my internship at Ittehad Chemicals Limited.
For my final-year project, I designed and developed a quadcopter-based medicine delivery system using ESP32, GPS, telemetry, and PID control. It included real-time flight monitoring, GPS tracking, and sensor-based navigation.
I also designed and assembled a prototype UPS with automatic switching, and developed an IoT speed detector that streamed measurements to a cloud dashboard and local display. As a Project Engineer at Al Haseeb Engine Company, I coordinated technical requirements between clients and Chinese manufacturers and tracked orders and milestones.

