At Zuva Petroleum, I supervised construction of a weighbridge at an LPG depot from pre-construction inspection through commissioning, monitoring contractor performance, progress, quality, safety and cost.
I also plan and schedule maintenance across depots and service stations. I log breakdowns in the CMMS, assign contractors, follow work through closeout and report progress to management.
At Zuva Petroleum, I process procurement in Syspro, track CAPEX and OPEX expenditure, and support safety inspections and QA/QC. I also maintain records and prepare technical and progress reports.
As a Civil and Water Engineering Intern at Dabane Trust Water Workshops, I contributed to water, irrigation and land rehabilitation works under the USAID-funded Amalima Loko programme. My work included borehole assessments, sand dam design and monitoring, dam construction supervision in Binga, and preparing Bills of Quantities, AutoCAD drawings and GIS maps.

