At FWO, I develop and update Primavera P6 schedules for the Kurram Tangi Multipurpose Dam Project (USAID) and Bannu Airstrip Project. I track planned against actual progress and prepare reports for project teams, management, and consultants.
For these projects, I have developed and revised baseline schedules and conducted delay analysis to support Extension of Time (EOT) claims. I coordinate with site teams and consultants on progress data, schedule revisions, and look-ahead planning.
At Karizma Construction Company Pvt Ltd., I gained hands-on experience inspecting steel, block masonry, and shuttering, and assisted with column layout and alignment checks. I also learned to prepare Bar Bending Schedules.
For my final-year project, I designed and tested paving blocks made with waste plastic as a binder, assessing compressive strength, water absorption, and durability. My civil engineering studies and project work have also included surveying, quantity estimation, and construction quality control.