At Empresa de Ingeniería y Proyectos del Petróleo, I designed water supply networks for buildings in the Gas Licuado de la Habana company’s area at Refinería Ñico López, including integrated network modeling to meet use needs and design standards.
I also designed sanitary, industrial, and stormwater drainage networks for facilities including the Base de Trasporte in Martí and the tank area rehabilitation at the base de supe tanqueros de Matanzas. My work included calculating and optimizing networks based on terrain conditions and design standards.
For fire protection, I designed and modeled a network expansion near terminal 221 after studying the existing system. I also developed a design methodology for fire protection systems in high-rise buildings using critical-state modeling and analysis of system failure points under extreme operating conditions.

