At Kasese Nails and Wood Industry Limited, I coordinated site preparation, civil works, and valve station construction for EACOP Right of Way Section 6. I also delivered structural works, mass earthworks, and drainage systems at Main Camp Pipe Yard 1 in Kakumiro.
On the Tilenga Project in Buliisa, I contributed to early civil works for the N2 Road and access roads including A1 West, A1 East, and A3. I oversaw pavement-layer construction and quality control, and managed mass earthworks and drainage at Tangi Camp Support Base.
At the National Building Review Board, I inspected construction sites and existing buildings for compliance with the Uganda Building Control Act 2013. I also assessed structural, electrical, and mechanical building systems and supported corrective actions.
At Zhongmei Engineering Group Ltd, I delivered steel and reinforced concrete works and reviewed structural drawings. I coordinated resources for earthworks and structural activities, and prepared regular progress reports. I hold an MSc in Structural Engineering and a BSc in Civil Engineering from the University of Sciences and Technology of Oran.

