At Titan Quality, I provide third-party QA/QC on construction and industrial projects, covering ITPs, site inspections, hold-point witnessing, defect close-out, welding supervision and protective coatings inspection.
On the Howden Millmerran Power Station Shutdown, I verify ITP, WPS and welder qualification record compliance for an airheater rotor retrofit and weld repairs. I identify weld defects and traceability gaps, then verify rectification and close out defects and nonconformance reports.
For Pensar’s Elermore Vale 1 Reservoir roof replacement, I cover project quality assurance, welding and protective coatings inspection, DFT testing and hold-point sign-off. I review contractor records, audit coating work and QA documentation, and advise on AS/NZS 5131 compliance.
My earlier work includes managing welding operations and qualification testing at LMATS Newcastle, coordinating ISO 9001 certification audits at Pipe Lining & Coating, and welding inspection on defence shipbuilding work at Forgacs Engineering. I also bring a trade and fabrication background, including welding inspection, weld mapping, CAD design and CNC plasma operation.