At Foundation Solar Energy (Pvt) Ltd, I supervised commissioning of a 2 MWp solar system and managed installation and commissioning of a 316 kWp system. I also oversaw operations and maintenance for 15.5 MWp of Army Solarization Projects.
I was appointed Project Director / Manager for a 2.82 MWh Battery Energy Storage System project at Fauji Foods Plant, Bhalwal, coordinating its planning, design, installation, testing, and commissioning. Earlier, at Pakistan Telecommunication Company Limited, I contributed to integrating solar monitoring with SNMP; my electrical engineering final-year project applied image processing and machine learning to blood-cell analysis.

