At Global Process and Pipeline Services (GPPS), I assisted with monitoring and inspecting electrical and electronic equipment during my industrial training.
I observed equipment conditions and reported issues to supervisors. I also assisted with technical documentation, data recording, and workplace reports.
On my final-year project, Sensor-Based Automatic Water Level Controller, I developed a system using an HC-SR04 ultrasonic sensor and microcontroller.
I integrated a relay, LEDs, power supply, microcontroller, and water pump, then tested the system at different water levels and documented the results. I completed my B.Eng. programme in Electrical & Electronics Engineering and expect my degree certificate in November 2026.

