At Mikros Engineering, Inc, I execute equipment and computerized-system qualification, including 15+ IQ/OQ/PQ protocols. This work achieved 100% adherence to validation requirements and reduced validation cycle time by 12%.
I authored validation plans, test protocols, scripts, traceability matrices, and reports, and identified and resolved 25+ defects through functional and regression testing. These efforts improved system reliability by 18% and strengthened documentation accuracy and audit readiness.
At S.K. Steel Industries, I completed 20+ validation cycles for manufacturing systems and equipment. I developed test documentation, investigated defects, and analyzed production and validation data to support acceptance-criteria compliance and quality audits.

