# Hire the best remote Earned Value Management Systems employees

Discover 22 remote Earned Value Management Systems workers who are looking for their next full-time, part-time or freelance opportunity on Himalayas.

Source: https://himalayas.app/talent/earned-value-management-systems

## 22 remote workers

| Person | Role | Location | Salary expectations | Intro |
| --- | --- | --- | --- | --- |
| [Hannah Mihalovic](https://himalayas.app/@hannahmihalovic) | Schedule Manager | United States |  | Master Scheduler and Earned Value Analyst with 8+ years supporting DoD aviation programs. |
| [Pedram Shojaeian](https://himalayas.app/@pedramshojaeian) | Project Controls Specialist | Canada |  | Senior project controls and scheduling specialist driving earned value, risk, and program performance. |
| [Denise Meza](https://himalayas.app/@denisemeza) | Project Controls Manager | United States | 90k+ USD | I build project controls systems, financial reporting, and Power BI dashboards for complex construction programs. |
| [Trey Robinson](https://himalayas.app/@treyrobinson) | Project Controls Specialist | United States |  | I optimize EVMS cost databases and integrate cost and schedule systems. |
| [Mercy Ojwang](https://himalayas.app/@mercyojwang) | Project Scheduler | United States |  | Project planner/scheduler specializing in Primavera P6 for EPC projects. |
| [Ayman Hassanien](https://himalayas.app/@aymanhassanien) | Project Controls Manager | Egypt | 60k+ USD | I lead refinery capital projects from planning through commissioning, controlling cost, schedule, and risk. |
| [rolanda hayes](https://himalayas.app/@rolandahayes) | Financial Analyst | United States | 104k+ USD | Financial analyst at Bansbach Easylift of North America, tracking performance for a $33M organization and improving financial reporting. |
| [Jose Martinez](https://himalayas.app/@josemartinez6) | Supply Chain Analyst | United States | 92k+ USD | Supply Chain Analyst at WellSpan Health supporting Oracle ERP and improving procurement, inventory, and supply chain reporting. |
| [Adesola User](https://himalayas.app/@adesolauser1) | Project Scheduler | United Kingdom | 60k+ GBP | Project Scheduler/Controller at LEONARDO, integrating schedule, cost, risk, change and EVM across complex aerospace programmes. |
| [Valeriya Neryakhina](https://himalayas.app/@valeriyaneryakhina) | Cost Estimator | United States |  | Senior cost estimation and project controls professional with 20+ years delivering EPC/EP projects for oil & gas and mining. |
| [Aly Joseph](https://himalayas.app/@alyjoseph) | Master Scheduler | United States |  | Master Scheduler with 15+ years leading IMS/EVMS for aerospace and defense, turning risk into actionable forecasts. |
| [Berkay Ozay](https://himalayas.app/@berkayozay) | Planning Engineer | Turkey |  | I build EPC schedules, earned value systems, and delay claims. |
| [Misty Dahlheimer](https://himalayas.app/@mistydahlheimer) | Schedule Manager | United States |  | Experienced program planner/scheduler driving on-time delivery with MS Project, Primavera P6, and EVMS expertise. |
| [Traneice Thomas](https://himalayas.app/@traneicethomas) | Project Scheduler | United States | 120k+ USD | Project Scheduler at Quanta Services aligning data center construction schedules with technology sprints. |
| [Rizwan Ali](https://himalayas.app/@rizwanali5) | Program Manager | Pakistan | 60k+ USD | Program Manager at Venturetronics Pvt Ltd (AngularSpring), leading electrification and data center power programs with Primavera P6 project controls. |
| [Marcin Bielski](https://himalayas.app/@marcinbielski) | Program Manager | Poland |  | I am a PMP-certified program manager delivering complex hardware, firmware, and software programs. |
| [Isac Abraham](https://himalayas.app/@isacabraham) | Planning Engineer | India | 140k+ INR | PMO Lead at Alchemy Techsol India Pvt Ltd, where I reduced project variance by 25% using WBS structures and Earned Value Management. |
| [Ikenna Nwachukwu](https://himalayas.app/@ikennanwachukwu) | Planning Engineer | Nigeria | 60k+ USD | Planning Engineer at Turner & Townsend, developing integrated project schedules and managing schedule risk across oil and gas projects. |
| [Sarah Khalil](https://himalayas.app/@sarahkhalil) | Project Management Coordinator | United States |  | Detail-oriented project controls professional with expertise in scheduling. |
| [Ngozi Mbakigwe](https://himalayas.app/@ngozimbakigwe) | Project Scheduler | United States |  | PMP-certified project scheduler and controls professional delivering CPM excellence and actionable insights. |

Page 1 of 2. Next page: [page 2](https://himalayas.app/talent/earned-value-management-systems.md?page=2)

To contact someone, message them from their profile with a Himalayas employer account: [Hire on Himalayas](https://himalayas.app/hire).
