# Hire the best remote Change Orders employees in Philippines

Discover 17 remote Change Orders workers in Philippines who are looking for their next full-time, part-time or freelance opportunity on Himalayas.

Source: https://himalayas.app/talent/countries/philippines/change-orders

## 17 remote workers

| Person | Role | Location | Salary expectations | Intro |
| --- | --- | --- | --- | --- |
| [Kristoffer Manuel Colinares](https://himalayas.app/@kristoffermanuelcoli) | Civil Engineer | Philippines | 80k+ PHP | Civil Engineer at APEX Facility Services who coordinates project documentation, purchasing, invoices, and timelines. |
| [Joseph Kent Gomez](https://himalayas.app/@josephkentgomez) | Change Manager | Philippines |  | Skilled Change Analyst with a focus on innovative strategies. |
| [Patricia Monique Sison](https://himalayas.app/@patriciamoniquesison) | Data Analyst | Philippines | 60k+ USD | Change Analyst at Medtronic Philippines improving QMS change workflows and analyzing quality system metrics. |
| [JuliusCzar belcaP](https://himalayas.app/@juliusczarbelcap) | Construction Project Coordinator | Philippines | 120k+ PHP | General Manager at JPAX Construction Services coordinating residential, fit-out, and civil projects through on-schedule handovers. |
| [jayson rivera](https://himalayas.app/@jaysonrivera) | Construction Cost Estimator | Philippines | 1048k+ PHP | Civil Engineer and estimator at Federal Doors pricing Division 8 and 10 packages for US projects. |
| [Hanna Sophia Hadji Hamim](https://himalayas.app/@hannasophiahadjihami) | Project Site Manager | Philippines |  | Civil engineer and site engineer focused on safety, quality, and on-time delivery. |
| [Regie Frace](https://himalayas.app/@regiefrace) | Project Coordinator | Philippines | 80k+ PHP | Project administration and coordination at Department of Public Works and Highways – Cagayan 3rd District Engineering Office; kept 14 projects on schedule. |
| [Kenzo Braye Gerale](https://himalayas.app/@kenzobrayegerale) | Quantity Surveyor | Philippines | 160k+ PHP | Quantity Surveyor/Estimator at St. Vincent General Construction Services Corp. preparing detailed BOQs and cost estimates. |
| [Albert Paule](https://himalayas.app/@albertpaule) | Civil Engineer | Philippines | 80k+ PHP | Construction estimator at TradeZ LLC who prepared estimates and bid proposals for US townhouses. |
| [Nicole Velasco](https://himalayas.app/@nicolevelasco) | Quantity Surveyor | Philippines |  | Civil engineer and quantity surveyor specializing in cost estimation and quantity take-offs. |
| [Eron Gabriel Carandang](https://himalayas.app/@erongabrielcarandang) | Estimator | Philippines |  | Civil Engineer with experience in residential estimating, quantity take-offs, and project support for local and Australian construction projects. |
| [Marc Adrian Dinozo](https://himalayas.app/@marcadriandinozo) | Estimator | Philippines | 80k+ PHP | Estimator at Virtual Construction Assistant pricing flooring finishes and preparing quotes for overseas clients. |
| [Irene Marco](https://himalayas.app/@irenemarco) | Project Manager | Philippines | 1800k-2000k PHP | I coordinate construction bids, documentation, and project lifecycles for Philippine and U.S. construction teams. |
| [Jolo Sison](https://himalayas.app/@jolosison) | Construction Estimator | Philippines | 1700k+ PHP | Construction estimator at South IronRock Corporation who priced a PHP 8.7M municipal water supply project that was won. |
| [Ken Michael Bermundo](https://himalayas.app/@kenmichaelbermundo) | Quality Improvement Analyst | Philippines |  | Improvement Analyst using Jira, Confluence, and customer insights to drive measurable change. |
| [Yvonne Louise Cabarrubias](https://himalayas.app/@yvonnelouisecabarrub) | Operations Manager | Philippines | 80k+ PHP | Operations Manager at Multihands coordinating UK maintenance jobs and client invoicing, with quantity surveying experience. |
| [Julius Roa](https://himalayas.app/@juliusroa) | Electrical Engineer | Philippines |  | I deliver electrical design, estimating, and project coordination for construction projects. |

Page 1 of 1.

To contact someone, message them from their profile with a Himalayas employer account: [Hire on Himalayas](https://himalayas.app/hire).
