# Hire the best remote Work Breakdown Structure (WBS) employees in India

Discover 18 remote Work Breakdown Structure (WBS) workers in India who are looking for their next full-time, part-time or freelance opportunity on Himalayas.

Source: https://himalayas.app/talent/countries/india/work-breakdown-structure-%28wbs%29

## 18 remote workers

| Person | Role | Location | Salary expectations | Intro |
| --- | --- | --- | --- | --- |
| [Ateeb Ahmad](https://himalayas.app/@ateebahmad) | Project Planner | India | 50k+ USD | Project Planning & Controls professional |
| [Vip Khatri](https://himalayas.app/@vipkhatri) | Planning Engineer | India | 140k+ INR | Senior Planning Engineer at Precon India Consulting LLP, developing Oracle Primavera Cloud schedules for JPI’s US construction projects. |
| [Samkit Chhajed](https://himalayas.app/@samkitchhajed) | Planning Engineer | India | 85k+ INR | Planning Engineer at SJ Contracts Pvt. Ltd. preparing Primavera P6 schedules and monitoring critical-path progress for construction projects. |
| [Mohit User](https://himalayas.app/@mohituser10) | Product Manager | India |  | I turn user research and data analysis into prioritized product and project decisions. |
| [Isac Abraham](https://himalayas.app/@isacabraham) | Planning Engineer | India | 140k+ INR | PMO Lead at Alchemy Techsol India Pvt Ltd, where I reduced project variance by 25% using WBS structures and Earned Value Management. |
| [Sarvamangala Madhu](https://himalayas.app/@sarvamangalamadhu1) | SAP PMO | India | 956k+ INR | SAP PMO at TCFM coordinating SAP delivery, governance, UAT and invoicing across an enterprise engagement. |
| [ABHAY kumar Prajapati](https://himalayas.app/@abhaykumarprajapati) | Project Coordinator | India | 470k+ INR | Project Coordinator trained through Google Project Management, who cut table turnaround time by 62% in a restaurant tablet rollout simulation. |
| [Mohammed Raziq](https://himalayas.app/@mohammedraziq) | Planning Engineer | India | 70k+ INR | I build Primavera P6 turnaround schedules, cost-loaded plans, and earned-value dashboards. |
| [shruti Bhatt](https://himalayas.app/@shrutibhatt1) | Project Planner | India |  | Project planner specializing in construction and EPC projects, delivering schedule-driven, cost-conscious solutions. |
| [Abhishek Mittal](https://himalayas.app/@abhishekmittal) | Project Manager | India | 140k+ INR | Project Manager at Open Access Technology India Private Limited who delivered ETRM and CTRM projects and improved client satisfaction by 30%. |
| [Rishabh Vyas](https://himalayas.app/@rishabhvyas1) | Project Manager | India | 1021k+ INR | Project Manager at Launchtrax who cut infrastructure delivery timelines by 25% across defense, aerospace, and academic programs. |
| [Shantanu Rojatkar](https://himalayas.app/@shantanurojatkar) | Project Manager | India | 210k+ INR | Project Manager at SFA Technology Pvt. Ltd. delivering AI-enabled content initiatives and Jira-based operational dashboards. |
| [Ashish Sharma](https://himalayas.app/@ashishsharma21) | Project Manager | India | 1523k+ INR | Project Manager at MARSDEVS coordinating OMLAPAY's 17-module digital wallet delivery. |
| [Rathlavath Raghavendra](https://himalayas.app/@rathlavathraghavendr) | Project Manager | India | 140k+ INR | I deliver residential and commercial construction projects through disciplined planning, execution, and quality control. |
| [mahesh mpc](https://himalayas.app/@maheshmpc) | SAP PS Functional Consultant | India | 5002k+ INR | SAP PS Functional Consultant at Capgemini who configured project hierarchies and integrated asset lifecycle reporting. |
| [Pratima Yadav](https://himalayas.app/@pratimayadav) | Project Coordinator | India |  | I coordinate high-voltage transmission line projects from execution tracking through reporting, cost control, and closure. |
| [shubhada gore](https://himalayas.app/@shubhadagore) | Project Manager | India | 1626k+ INR | Project Manager at Aragen Life Sciences Limited who managed seven concurrent Fee-for-Service projects and delivered 100% OTIF. |
| [Sishanki Padhi](https://himalayas.app/@sishankipadhi) | Civil Engineer | India | 609k+ INR | Civil engineering intern who surveyed irrigation canals and checked field measurements against AutoCAD drawings. |

Page 1 of 1.

To contact someone, message them from their profile with a Himalayas employer account: [Hire on Himalayas](https://himalayas.app/hire).
