# Hire the best remote Construction Scheduling employees in Greece

Discover 13 remote Construction Scheduling workers in Greece who are looking for their next full-time, part-time or freelance opportunity on Himalayas.

Source: https://himalayas.app/talent/countries/greece/construction-scheduling

## 13 remote workers

| Person | Role | Location | Salary expectations | Intro |
| --- | --- | --- | --- | --- |
| [Thomas Colonna d'Istria](https://himalayas.app/@thomascolonnadistria) | Planning Engineer | Greece | 60k+ EUR | I plan and control complex high-rise construction programmes using Primavera P6, CPM, Lean delivery, and data-driven reporting. |
| [Georgios Pikos](https://himalayas.app/@georgiospikos) | Project Manager | United States | 75k-165k USD | Construction Project Manager at Regeneron and Tesla who delivered capital projects and secured $7M in approved savings. |
| [stela p](https://himalayas.app/@stelap) | Civil Engineer | Greece | 50k+ EUR | Permitting Lead at TAP coordinating permitting for the Compressor Station Expansion Project and environmental investments in Greece. |
| [Effie Bachrami](https://himalayas.app/@effiebachrami) | Structural Engineer | Greece | 101k+ GBP | Site Engineer and Construction Manager at Costa Navarino, supervising a 32-unit residential construction project. |
| [FLORA IOANNIDI](https://himalayas.app/@floraioannidi) | Project Manager | Greece | 30k+ EUR | Project Manager at Primal advisors, developing residential projects from concept to delivery. |
| [Nefeli Dimela](https://himalayas.app/@ndimela) | Project Manager | Greece | 45k+ EUR | I coordinate technical projects, construction operations, and stakeholders from planning through delivery. |
| [Georgios Zisoglou](https://himalayas.app/@georgioszisoglou) | Project Manager | Greece | 50k+ EUR | Project Manager at Metlen delivering utility-scale solar PV, BESS and HV/MV infrastructure from RTB through PAC. |
| [michailia flessa](https://himalayas.app/@michailiaflessa) | Interior Architecture | Greece | 35k+ EUR | Technical Office Manager at ELEKA who coordinated One&Only Resort, Ikos Kissamos and Ilion Heart projects. |
| [marilia karvouni](https://himalayas.app/@mariliakarvouni) | Operations And Project Management | Greece | 45k+ EUR | Operations Manager at SmartPlan Management, where I coordinated daily operations for 61 short-term rental properties and an 8-person team. |
| [Athanasios Michalakidis](https://himalayas.app/@athanasiosmichalakid) | Environmental Engineer | Greece | 35k+ EUR | Environmental engineer coordinating construction projects at LS Construction SKG, with a master's thesis on CHP–battery energy management for greenhouse energy supply. |
| [dhmhtra kanellopoulou](https://himalayas.app/@dhmhtrakanellopoulou) | Architectural Engineer | Greece |  | Architectural Engineer skilled in BIM workflows and sustainable, high-quality design delivery. |
| [Anastasia Albertin](https://himalayas.app/@anastasiaalbertin) | Project Engineer | Spain | 0-0 EUR | BIM Project Engineer specializing in water supply, wastewater, and infrastructure coordination with Autodesk Revit and Civil 3D. |
| [Maria Kougioumtzidou](https://himalayas.app/@mariakougioumtzidou) | Mechanical Engineer | Greece |  | Mechanical engineer specializing in HVAC and construction management. |

Page 1 of 1.

To contact someone, message them from their profile with a Himalayas employer account: [Hire on Himalayas](https://himalayas.app/hire).
