Storage tank designer and engineering manager at Pars Fonoon, supporting commissioning and start-up and designing API 650, API 620 and API 653 tanks.
```

| Detail | Value |
| --- | --- |
| Availability | Open to opportunities |
| Location | Iran |
| Authorized to work in | Iran |
| Salary expectations | 30k+ USD |
| Job categories | Mechanical Engineer, Engineering Manager, Tank Design |
| Skills | Tank Design, Storage Engineering, API 650, API 620, API 653, API 625, Pre Commissioning, Commissioning, Startups, Finite Element Analysis, Mechanical Engineering, Mechanical Design, Internal Structure Design, Process Piping |
| LinkedIn | https://linkedin.com/in/nima-z-parsa |

## What I'm looking for

```text
I’m always open to new projects.
```

## About

```text
At Pars Fonoon, I provide engineering support for commissioning and start-up, prepare procedures for pre-commissioning, commissioning, start-up and performance tests, and supervise pre-commissioning.

At SPG Steiner GmbH, I worked on two API 620 full-containment tanks for the Bushehr Petrochemical Olefin Plant. I also worked on the mechanical and internal structure design for a 105,000 m³ propane tank at Ceyhan Terminal Facility.

My work spans storage tank design across EPC stages, including API 650, API 620, API 653 and API 625 tanks. I’m a freelance storage tank designer and am always open to new projects.
```

## Experience

### Deputy Engineering Manager (current)

Pars Fonoon. Jul 2026 - Present

```text
Detail Engineering endorsement.
Engineering support for commissioning and start-up.
Provision of required procedures for pre-commissioning, commissioning, start-up and performance tests.
Pre-commissioning supervising.
```

### Engineering Project Manager

SPG Steiner GmbH. Feb 2025 - Jul 2026

```text
Bushehr Petrochemical Olefin Plant:
- Two Ethylene and Ethane API620-AppQ Steel-Steel full containment storage tanks
```

### Engineering Manager

FSG Paya. Jan 2025 - Jul 2026

```text
Almas-e Mahshahr Olefin Project:
- One Ethylene API620-AppQ Steel-Steel full containment storage tank

Kangan Petrochemical Olefin Plant
- Two Ethylene and Ethane API620-AppQ Steel-Steel full containment storage tanks
```

### Project Lead Mechanical Engineer

SPG Steiner GmbH. Dec 2024 - Aug 2025

```text
Mechanical and Internal Structure design of the project.
Project consist of an API620-AppR+L/ACI376 Steel-Concrete double wall full containment Propane tank with nominal 105,000m3 capacity in Ceyhan Terminal Facility within PDH-PP CEYHAN project.
```

### Senior Mechanical Engineer

Ideh Tadbir Maham (ITM). Oct 2024 - Mar 2025

```text
The 4.8 MW Caspian 2 power plant project, located in Sowmeh Sara Industrial Town, is under construction in line with the policies of the law of the country's Sixth Development Plan and on a land with an area of 4000 square meters. This power plant, which has the ability to generate electricity and heat simultaneously, is more environmentally friendly compared to large thermal power plants, and in
```

### Technical department & founder

Expert Academy. Feb 2018 - Oct 2024

```text
- Infrastructure design for multi-national company inter-connectivity through 3 countries
- Machine learning Engineering for AI for Economic News impact on Stock markets and currency pairs.
- AI training for trading based on economic news
```

### Project Engineer

Tehran Jonoob Technical & Construction Co.. May 2021 - May 2022

```text
Engineering Coordination:
- Gachsaran HDPE (EPC)
```

### Project Engineer

Tehran Jonoob Technical & Construction Co.. Mar 2014 - Jun 2018

```text
Bidbolan2 PackageB
- Project engineering
- Procurement Engineering services
- Field engineering & construction consultancy & etc

Genaveh 10 Million BBLCrude Oil Storage Tanks project including:
- Procurement Engineering services
- Field engineering & construction consultancy & etc

Mechanical documents preparation for tenders such as:
- Ad Duqm Pipeline (Omman)
- Metering Station at Bibiyana, Hab
```

### Project Engineering Manager

Tehran Jonoob Technical & Construction Co.. May 2011 - Mar 2014

```text
LPG Tanks of South Pars Gas Development Field - PHASE 20 & 21.
```

### Senior Piping and Mechanical Engineering

Payandan. May 2010 - May 2011

```text
-South Pars Gas Field Development – Phase 14 Including:
101,104,105,107,111,113,114,115,116 Units (C)
Non Industrial Buildings (EPC)
For P.O.G.C.
```

### Site Technical Manager

Payandan. May 2009 - May 2010

```text
500,000 bbl Crude Oil Double-deck floating roof storage tank in Lavan Island(EPC) for I.O.O.C
```

### Project Engineering Manager

Payandan. Aug 2008 - May 2009

```text
500,000 bbl Crude Oil Double-deck floating roof storage tank in Lavan Island(EPC) for I.O.O.C
```

### Equipment and Piping Engineer

Payandan. Dec 2006 - Aug 2008

```text
Mahshahr new oil depot piping & storage tank design for N.I.O.P.D.C tender.
New Bandar Abbas & Rei oil depot & railroad terminal concept design for R.A.J.A. including 4 storage tanks with 300,000 bbl capacity.
Two 1,000,000 bbl Crude Oil Double Deck floating roof storage tank in Bahregan Zone for I.O.O.C tender.
Water injection development of Esfand Oil field in Sirri Island tender.
```

### Production Development Specialist

Azin Khodro Industrial Group. Mar 2005 - Dec 2006

```text
Worked as Production Development Specialist at Azin Khodro Industrial Group.
```

## Education

### California Miramar University

Strategic Response to COVID-19: the New Normal

```text
Issued Feb 2021
```

### Novin Parsian Higher Education Center

Piping design - CAESAR2 Software

```text
Issued Jan 2010
```

### Novin Parsian Higher Education Center

PDMS Software

```text
Issued Aug 2008
```

### Novin Parsian Higher Education Center

Piping Design

```text
Issued Feb 2007
```

### Niku Segal Engineering group

Problem Solving Tools

```text
Issued Jan 2007
```

### Niku Segal Engineering group

Teamwork and Effective meetings

```text
Issued Feb 2007
```

### Niku Segal Engineering group

Group decision making

```text
Issued Jan 2007
```

### Niku Segal Engineering Group

Problem Solving Methodology

```text
Issued Jan 2007
```

### Sazeh Gostar Saipa (S.G.S)

OEE

```text
Issued Apr 2006
```

### Islamic Azad University of Karaj

B.Sc, Mechanical Engineering-Fluids & Heat. 2001 - 2005

## Tech stack

- Factory
- Machine Learning

To contact Nima, message them from this profile with a Himalayas employer account: [Hire on Himalayas](https://himalayas.app/hire).

## People also viewed

- [Mehran Ahadi](https://himalayas.app/@mehranahadi): QC and Technical Office, Jaddeh Construction Company
- [Ali Hasheminzhad](https://himalayas.app/@alihasheminzhad): Mechanical Maintenance Technician, Pardis Petrochemical Complex
- [Azin Cheraghian](https://himalayas.app/@azincheraghian1): Mechanical Engineer (Rotating Equipment & Packages), Nardis Energy Engineering Co.
- [Hamidreza Gholampour](https://himalayas.app/@hamidrezagholampour): Commercial Specialist – Mechanical Procurement & Contracts, Aseman Bikaran Hashtom (Baran Holding)
- [behzad afzali](https://himalayas.app/@MohammadAfzali): Project Engineering Manager, ITS
- [amir zamanpour](https://himalayas.app/@amirzamanpour): Engineering Manager, Rahpouyan e Sharif San’at Engineering Co. (SIPEC)
- [ctep-project gas-area](https://himalayas.app/@ctep-projectgas-area): Lead Process Engineer, ENERCHIMI Company
- [Jalal Ghotbi](https://himalayas.app/@jalalghotbi): I&C Lead Engineer, Bakhtar Group
- [Hooman Lohrasbi](https://himalayas.app/@hoomanlohrasbi): JASK Oil Terminal Project Manager, IOEC Company
- [Reza Sadeghi](https://himalayas.app/@rezasadeghi1): Mechanical Design & CAE Consultant, Self Employed