# Mario Aragon

Mario Aragon is a remote worker on Himalayas, Plant Manager at Onest, based in Mexico.

Source: https://himalayas.app/@marioaragon

```text
Plant manager with 19+ years improving logistics, manufacturing engineering, quality, Program Management and cost performance, P & L.
```

| Detail | Value |
| --- | --- |
| Availability | Open to opportunities |
| Location | Mexico |
| Authorized to work in | Mexico |
| Job categories | Plant Manager, Plant Manager, Manufacturing Engineering Manager, Project Program Management Specialist, Capital Equipment Manager, Launch Manager, Manufacturing Manager, Production Manager |
| Skills | Warehouse Management, Plant Management, Quality Control, Program Management, Project Management, VAVE, Lean Manufacturing, Continuous Improvement, Root Cause Analysis, Supplier Development, Capital Planning Tools, APQP, AMEF, Design For Manufacturability (DFM), Toyota Productions System, 8Ds, CAD, REFA Methodology, Time Studies, Negotiation, Aragon, Harness, Neuro, SWT |
| LinkedIn | https://linkedin.com/in/mario-aragon-88180b9 |

## What I'm looking for

```text
I’m looking to lead a plant or logistics/manufacturing operation where I can own quality, cost, and delivery—driving continuous improvement, VAVE/cost avoidance, Lean execution, and strong program/supplier management to hit business targets.
```

## About

```text
I’m a Plant Manager with “19 + years of progressive experience” across manufacturing, launch, and logistics operations, focused on delivering quality, cost, and delivery results. I lead with strong program and continuous improvement disciplines, including “VAVE and Program/Project Management” and Lean methods to drive measurable performance.

Most recently, I managed a “54, 660 mts. 2 logistic warehouse,” supporting “Average Inventory Value $ 15 M USD” and “Average monthly billing $ 13.5 M,” while reducing fixed costs by “55 %” and improving warehouse performance by “11 % percentage points.” Earlier, I scaled production from “6K pcs/mo. to 13K pcs/mo.” through monthly volume/quality/cost target planning, quality controls, and reliable launch execution—while also operating in “Americas Region” capital equipment and supplier development programs with “Budget 110 MUSD.”
```

## Experience

### Plant Manager

Onest. May 2024 - Jun 2025

```text
Managed a 54,660 m² smart logistics warehouse and operations, overseeing average inventory value of $15M USD and monthly billing of $13.5M. Reduced fixed costs by 55% and improved warehouse performance by 11 percentage points through implementation of quality controls.
```

Skills: Plant-Operations, Warehouse-Management, Inventory-Management, Cost-Reduction-(VAVE), Quality-Control, KPI-Reporting, Process-Improvement, Team-Leadership

### Launch Manager

Sack S.A. de C.V.. Aug 2018 - May 2024

```text
Launched and scaled polypropylene big bag and wire-harness production, increasing output from 6K pcs/month to 13K pcs/month. Led plant launch projects across 25+ employees and 20+ customers, driving VAVE initiatives and monthly quality/cost/delivery targets while sustaining continuous improvements.
```

Skills: Launch-Management, Program-Management, VAVE-Cost-Avoidance, Production-Planning, Quality-Management, Continuous-Improvement, KPI-Management, Stakeholder-Management, Operational-Excellence

### Manufacturing Engineering Manager

Yazaki. May 2016 - Aug 2018

```text
Led the Manufacturing Engineering Group, owning production process design and ensuring Chrysler/Jeep/Ram program requirements for quality, cost, delivery, and environment. Managed manufacturing production line transfers and production launch activities, including root-cause analysis and mentoring.
```

Skills: Manufacturing-Engineering, Lean-Manufacturing, Process-Design, Production-Line-Transfers, Quality-Assurance, Root-Cause-Analysis, Compliance-Management, Mentorship

### Capital Equipment Manager

Yazaki. Jun 2012 - May 2016

```text
Managed regional and global capital equipment sourcing and supplier development, including supplier prototype phase risk analysis, delivery and cost, and ISO/TS 16949 compliance activities. Built quality integration strategies, handled supplier escalation and price harmonization, and supported capital investment planning with an Americas region budget of $110M USD.
```

Skills: Supplier-Development, Capacity-and-Equipment-Risk-Analysis

### Manufacturing Engineering Planner

Yazaki. May 2003 - May 2005

```text
Planned and launched multiple wire-harness programs, managing APQP activities and KPI reporting to customers while resolving quality issues using structured problem solving (8D). Administered lean office processes and supported product transfers and DFM guidelines to enable early quality and cost-reduction outcomes.
```

Skills: APQP, KPI-Reporting, Lean-Office, Customer-Quality, VAVE-Cost-Reduction, Product-Transfer

### Advance Manufacturing Engineer

Alcoa Fujikura Limited. May 1998 - May 2003

```text
Developed manufacturing and quality engineering processes for new design changes to eliminate top quality concerns from final assembly and customer plants. Coordinated feasibility studies, prototype/tooling builds, change containment implementation, and PPAP/pilot build support through Job 1/SOP readiness.
```

Skills: Process-Engineering, Quality-Engineering, Print-Tooling-Feasibility, PPAP-Support, Manufacturing-Documentation

## Education

### Instituto Tecnológico de la Laguna

Bachelor of Science in Industrial Engineering, Industrial Engineering. 2009 - 2012

```text
Earned a B.S. in Industrial Engineering from Instituto Tecnológico de la Laguna (2009–2012).
```

## Tech stack

- SWT
- Neuro
- Root Cause
- Harness
- Aragon
- Make
- Phase

To contact Mario, message them from this profile with a Himalayas employer account: [Hire on Himalayas](https://himalayas.app/hire).

## People also viewed

- [Emilio Glez P](https://himalayas.app/@emilioglezp): Regional Program Manager Americas, Cummins
- [Gricell Vega](https://himalayas.app/@gricellvega): Project Manager, Autoliv Mexico Tech Center
- [Ramón Zambrano](https://himalayas.app/@ramonzambrano): Supply Chain & Procurement Manager, CUU Industrial Supplies
- [Osvaldo de María González Espinosa](https://himalayas.app/@odmgonzaleze): Co Founder / Project Development & Business Operations, Grupo Cardop
- [Juan Lozano](https://himalayas.app/@juanlozano3): Gerente de Planta, Technifoam de México SA de CV
- [Gustavo Alonso Maldonado Orozco](https://himalayas.app/@gustavoalonsomaldona): LATAM Operations Director, PPG Industries
- [corina avila](https://himalayas.app/@corinaavila): Factory Program Manager, Pegatron
- [Diego Cruz](https://himalayas.app/@diegocruz1): Engineering Manager, Serviacero Componentes
- [Max Blazquez](https://himalayas.app/@maxblazquez): Interim Strategic Manager, Carmi Global
- [Armando Medina](https://himalayas.app/@armandomedina1): Logistics Manager, Automotive OEM Account / Ford Plant Operations
