# Fareena Khan

Fareena Khan is a remote worker on Himalayas, MEP Projects Intern at DWP Technologies Pvt. Ltd., based in Pakistan.

Source: https://himalayas.app/@fareenakhan

```text
Electrical engineer at Karot Power Company, where I inspected generators and transformers at a 720 MW hydropower plant.
```

| Detail | Value |
| --- | --- |
| Availability | Looking for a job |
| Location | Pakistan |
| Authorized to work in | Pakistan |
| Salary expectations | 59k+ USD |
| Job categories | Electrical Engineer |
| Skills | Power Distribution, Protection Systems, Relay Coordination, Preventive Maintenance, Equipment Inspection, Fault Diagnosis, Load Management, Power Systems, Solar PV Systems, Penetration Rate Analysis, Generators, Transformers, Motor, Switchgear, Single Line Diagrams |
| LinkedIn | https://linkedin.com/in/fareenakhan |

## What I'm looking for

```text
I'm seeking an Electrical Engineer role in Islamabad focused on electrical maintenance, power systems, and technical projects.
```

## About

```text
At Karot Power Company (Pvt.) Ltd., I monitored and inspected generators, transformers, and auxiliary systems at a 720 MW hydropower plant. I also completed preventive maintenance and fault-identification walkdowns alongside plant engineers.

At USPCAS-E, NUST, I analyzed transformer thermal stress and fuse-recloser protection coordination under varying solar PV penetration using MATLAB models. The paper was accepted for presentation at SUSTAIN 2026.

As an MEP Projects Intern at DWP Technologies Pvt. Ltd., I worked on electrical distribution boards, cabling, and load connections, and interpreted single-line diagrams and electrical layouts for on-site implementation.

My experience also includes industrial electrical systems, motors, control panels, and maintenance at SAJJAN Industries. I hold an MS in Electrical Power Engineering from NUST and a BE in Electrical Engineering.
```

## Experience

### MEP Projects Intern

DWP Technologies Pvt. Ltd.. Apr 2026 - Jun 2026

```text
Executed and monitored electrical systems within MEP projects, including distribution boards, cabling and load connections. Interpreted single-line diagrams and electrical layouts for on-site implementation.
```

Skills: MEPs, Electrical-Systems, Distribution-Boards, Cabling, Load-Connections, Single-Line-Diagrams, Electrical-Layouts, HVAC-Integration

### Research Assistant

USPCAS-E, NUST. Sep 2025 - Jan 2026

```text
Analyzed transformer thermal stress and fuse-recloser protection coordination under varying solar PV penetration using MATLAB models. Prepared technical documentation and structured reports supporting publication.
```

Skills: Matlab, Thermal-Analysis, Protection-Coordination, Solar-PV-Penetration, Technical-Documentation

### Intern

Karot Power Company (Pvt.) Ltd.. Jul 2025 - Aug 2025

```text
Monitored and inspected generators, transformers and auxiliary systems at a 720 MW hydropower plant. Reviewed protection schemes and grid synchronization processes, and prepared technical reports.
```

Skills: Generators, Transformers, Auxiliary-System-Design, Preventive-Maintenance, Defect-identification, Protection-And-Control-Schemes, Electric-Grid-Synchronization, Technical-Reporting

### Electrical Engineer Intern

SAJJAN Industries. Jun 2023 - Jul 2023

```text
Gained hands-on exposure to industrial electrical systems, motors, control panels and maintenance. Observed motor and panel wiring, equipment inspection, lubrication and preventive maintenance.
```

Skills: Electrical-Systems, Motor, Control-Panels, Preventive-Maintenance, Vibration-Monitoring

## Education

### National University of Sciences and Technology (NUST)

Master of Science, Electrical Power Engineering. 2024 - Present. Grade: 3.4/4

```text
Pursuing MS in Electrical Power Engineering at USPCAS-E, NUST, with a CGPA of 3.4/4. Research focuses on transformer thermal stress and protection coordination under high solar PV penetration.
```

### NFC Institute of Engineering & Technology

Bachelor of Engineering, Electrical Engineering. 2020 - 2024. Grade: 3.35/4

```text
Completed BE in Electrical Engineering with a CGPA of 3.35/4, gaining foundational knowledge in electrical systems and power engineering.
```

## Tech stack

- MATLAB
- Transformers
- Microsoft Office 365
- AutoCAD
- Microsoft PowerPoint

To contact Fareena, message them from this profile with a Himalayas employer account: [Hire on Himalayas](https://himalayas.app/hire).

## People also viewed

- [Mahnoor Abbasi](https://himalayas.app/@mahnoorabbasi25): Trainee Engineer, IESCO (Islamabad Electric Supply Company Limited)
- [Abdul Wahab](https://himalayas.app/@abdulwahab9): Electrical Engineering Intern, AEL, Power Plant
- [Sohail Ahmed](https://himalayas.app/@sohailahmed1): Internship Trainee, ZIMCO International Corporation
- [Saffi Shah](https://himalayas.app/@saffishah): Internee Engineer, NTDC Ltd.
- [Shahriyar Pechuho](https://himalayas.app/@shahriyarpechuho): Electrical Engineering Intern, Pakistan Meteorological Department
- [Rehman Uz Zaman](https://himalayas.app/@rehmanuzzaman): Trainee Engineer (Electrical), S.M.J International Industries Pvt Ltd
- [Hussain Haider](https://himalayas.app/@hussainhaider): Electrical Site Supervisor, DGES
- [Sajid Noor](https://himalayas.app/@sajidnoor): Electrical Engineer Intern, Water and Power Division (P&W), Skardu
- [Nasiruddin Msd](https://himalayas.app/@nasiruddinmsd): Trainee Solar PV Installation & Commissioning Engineer, Residential Hybrid Solar PV System
- [Zeeshan Akhtar](https://himalayas.app/@zeeshanakhtar): PEC GET Program (Field Training), National Grid Company of Pakistan Limited
